Man Lift 22 Meter for rent in Jeddah

Man Lift 22 Meter Rental in Jeddah

The 22 m man lift adds two meters over the entry size, often the difference between reaching the roof edge of a five- or six-story building and stopping just short, with enough outreach to stand clear of scaffolds and trenches.

Available for immediate rental TUV Certified Inspection 24/7 Support

About the 22 m man lift (boom lift)

The 22 m man lift sits between the 20 m and 24 m sizes, and most machines in this class are telescopic, putting the basket out roughly 13–17 m, with articulating versions less common. At around 10–12 t it runs on diesel with four-wheel drive and rough-terrain tires, so it handles dirt tracks and gentle ramps without needing a concrete slab.

For a quote we need three things: the highest point of the job, the closest the machine can stand to the façade, and what the ground is like at that spot. On façade work at this height the machine usually moves along the building several times a day, so a cleared, level path beside the wall saves the crew more time than any difference in size.

22 m man lift (boom lift): typical specifications

Working heightapprox. 22 m
Platform floor heightapprox. 20 m
Max horizontal outreachapprox. 13–17 m
Boom typemostly telescopic; articulating versions exist
Platform capacityapprox. 230–300 kg
Machine weightapprox. 10–12 t
Drive and tiresdiesel, 4WD, rough-terrain tires (often foam-filled)

Typical values for this size class — they vary by model. The exact figures for the unit available are confirmed with your quotation.

What a 22 m man lift (boom lift) is hired for

  • Glazing repairs on mid-rise frontages

    Side reach lets the crew work the façade without parking on the narrow sidewalk or over inspection chambers.

  • Painting factory steelwork

    It moves around the structure on dirt ground and reaches the top beams at about 18–20 m.

  • Pipe supports and external ductwork

    Carries two fitters and their tools to fix a run of supports at similar heights before moving to the next section.

  • Event and seasonal lighting rigs

    Reaches the top of temporary trusses, stage frames and entrance arches during short build-up windows.

Is the 22 m man lift (boom lift) the right size?

  • Smaller size20 m man lift (boom lift) — If the highest point is under about 18 m and the machine can get reasonably close, the 20 m man lift is enough, and it is shorter and easier to maneuver in tight lanes.
  • Larger size24 m man lift (boom lift) — If scaffolding or an excavation forces the machine to stand well back, the 24 m man lift makes up the height lost to outreach.

What the 22 m man lift (boom lift) rental includes

  • A trained operator on request
  • Delivery to your site in Jeddah or any city in the Kingdom
  • Inspection before dispatch and scheduled maintenance throughout the contract
  • A replacement unit if the machine fails during the contract
  • Daily, weekly, monthly and long-term contracts
  • Requests and support 24 hours a day

We serve Jeddah and every city in the Kingdom, with dedicated pages for the busiest: man lifts in Jeddah man lifts in Riyadh man lifts in Makkah man lifts in Madinah All service areas

22 m man lift (boom lift) rental questions

How many floors can a 22 m man lift reach?
With residential floors of around 3–3.5 m, it reaches the roof edge of a five- to six-story building when it can stand close to the wall. The further back it stands, the less height is left, so tell us the likely distance between the set-up point and the building.
Can a 22 m man lift work near power lines?
The boom and basket must keep a safe distance from overhead lines, typically at least 3 m for low and medium voltage and more as the voltage rises. If the work is closer than that, arrange an isolation with the power company before the machine arrives.
Why do you ask about the ground before sending a 22 m man lift?
With the boom out to one side, much of the machine's weight passes through one or two wheels, and loose sand or uncompacted fill can sink under them and tip the chassis. Knowing the ground beforehand means a firm path or spreader boards are ready before the shift starts.
Is the 22 m man lift diesel or electric?
Most machines at this height are diesel 4×4s built for outdoor sites; electric and hybrid versions exist but are less common. If the facility bans diesel exhaust, or the work is inside a closed building, say so when you ask so we can check what is available.
International Certifications

ISO Certifications

We are committed to international standards of quality, safety, and environmental management.

ISO 9001
ISO 9001
Quality Management
ISO 14001
ISO 14001
Environmental Management
ISO 45001
ISO 45001
Occupational Health & Safety
Internationally Certified
Global Standards
Certified Quality

Send Your Inquiry Now

We prioritize rapid response time.

Preferred contact method

Need a quick quote? Call us at +966 58 069 9998