Crane 200 Ton for rent in Jeddah

Crane 200 Ton Rental in Jeddah

At 200 tons, counterweight starts arriving on separate trucks and rigging takes hours. This size is booked for heavy bridge beams, desalination and power-plant modules, and process vessels.

Available for immediate rental TUV Certified Inspection 24/7 Support

About the 200-ton crane

From around 200 tons the job changes shape: the crane itself arrives on five axles, its telescopic boom extending to roughly 68–72 m, but its counterweight, which can exceed 50 tons, comes on several trucks, as does any lattice jib the lift needs. Rigging on site takes hours rather than minutes and needs a laydown area beside the crane for counterweight slabs and truck movements.

Because rigging and de-rigging take time, it pays to group a project's heavy lifts into one visit rather than calling the crane back several times. Fix the rigging area before arrival too: compacted ground big enough for the crane and trucks together, clear of excavations and overhead lines. If the site is in a residential district, say so, as truck access may be limited to certain hours.

200-ton crane: typical specifications

Maximum rated capacity200 t at very short radius
Main boom lengthapprox. 68–72 m, telescopic
Maximum tip height with lattice jibapprox. 95–110 m
Axlestypically 5
Counterweighttravels on separate trucks
Rigging timeseveral hours, depending on counterweight and jib
Outrigger spreadapprox. 8.5–9.5 m

Typical values for this size class — they vary by model. The exact figures for the unit available are confirmed with your quotation.

What a 200-ton crane is hired for

  • Bridge beams over roads

    Lifts long concrete beams during a night closure and covers the reach from the road shoulder to mid-span.

  • Desalination and power plants

    Sets large pumps, packaged units and turbine components in coastal plants.

  • Process vessels and exchangers

    Lifts mid-size vessels and upends them, alone or with a tailing crane.

  • Aircraft hangars and exhibition halls

    Erects heavy long-span roof members from outside the building footprint.

Is the 200-ton crane the right size?

  • Smaller size160-ton crane — A 160-ton crane comes with fewer trucks and starts lifting sooner, so choose it if its chart covers the heaviest piece.
  • Larger size250-ton crane — If the lift needs more than about 72 m of boom, or heavier loads past the 30 m mark, move up to a 250-ton crane.

What the 200-ton crane rental includes

  • An operator or driver with the machine for the whole job
  • Delivery to your site in Jeddah or any city in the Kingdom
  • Inspection before dispatch and scheduled maintenance throughout the contract
  • A replacement unit if the machine fails during the contract
  • Daily, weekly, monthly and long-term contracts
  • Requests and support 24 hours a day

We serve Jeddah and every city in the Kingdom, with dedicated pages for the busiest: cranes in Jeddah cranes in Riyadh cranes in Makkah cranes in Dammam cranes in Jubail All service areas

200-ton crane rental questions

What happens between a 200-ton crane arriving and its first lift?
The standing position is marked and the crane set on its outrigger mats, the trucks unload the counterweight slabs and the crane usually fits them itself, any lattice jib is mounted, and pre-use checks are done. That typically takes several hours, and de-rigging afterwards takes nearly as long.
Does a 200-ton crane need an assist crane to rig?
In most configurations, no: a crane of this size lifts its own counterweight slabs off the trucks, and a folding jib is mounted with its own hoist. An assist crane becomes more likely with long lattice extensions, and is more common in the 400 and 500-ton classes.
Does a 200-ton crane need a permit to travel by road?
The crane is built to travel within axle-load limits once its counterweight is off, but its weight and dimensions may still need a permit or escort on some roads and bridges. Give the exact site address, as the route can affect the arrival date.
Can a 200-ton crane lift over a road at night?
Yes. Many bridge lifts are done at night to limit the closure, but closing the road needs a permit and advance coordination with traffic police. Send the approved closure date so the crane and its trucks arrive and rigging is finished before the closure starts.
International Certifications

ISO Certifications

We are committed to international standards of quality, safety, and environmental management.

ISO 9001
ISO 9001
Quality Management
ISO 14001
ISO 14001
Environmental Management
ISO 45001
ISO 45001
Occupational Health & Safety
Internationally Certified
Global Standards
Certified Quality

Send Your Inquiry Now

We prioritize rapid response time.

Preferred contact method

Need a quick quote? Call us at +966 58 069 9998