Crane 500 Ton for rent in Jeddah

Crane 500 Ton Rental in Jeddah

The 500-ton crane is for the heaviest and highest mobile lifts: seven or eight axles and a tip height of roughly 130–150 m with lattice jib, for wind turbines, heavy refinery columns and the largest bridge girders.

Available for immediate rental TUV Certified Inspection 24/7 Support

About the 500-ton crane

The 500-ton crane sits at the top of the wheeled mobile-crane range. It typically has a telescopic boom of about 50–85 m, extended with lattice sections, a boom-guying system and counterweight that can exceed 150 tons, all arriving on a long truck convoy. What it adds over a 400-ton is not height alone but the capacity it keeps at 40 m radius and beyond.

Preparing for a 500-ton crane can start weeks ahead: a detailed lift plan, a ground-bearing check, permits for the transport convoy and its escort, and a large rigging area that may need a compacted gravel pad. If a lift goes beyond this size's chart, the answer is usually a larger crawler crane or a hydraulic jacking or gantry system, so send the details and the method can be worked out.

500-ton crane: typical specifications

Maximum rated capacity500 t at very short radius
Main boom lengthapprox. 50–85 m telescopic, plus lattice sections
Maximum tip height with lattice jibapprox. 130–150 m
Crane typeall-terrain or crawler
Axlesapprox. 7–8
Counterweightcan exceed 150 t, on a truck convoy
Rigging timeone to several days, depending on configuration

Typical values for this size class — they vary by model. The exact figures for the unit available are confirmed with your quotation.

What a 500-ton crane is hired for

  • Wind turbine erection

    Lifts tower sections, nacelle and rotor to hub height on turbines whose weights and heights fall within its chart.

  • The heaviest columns and reactors

    Main crane for upending very heavy columns in refineries and petrochemical plants, with a tailing crane on the bottom end.

  • The largest bridge girders

    Sets the heaviest steel and concrete girders at long radius from a safe standing position on firm ground.

  • Long-reach lifts in plants

    When the only standing room is outside the units, it keeps high capacity at 40 m and more.

Is the 500-ton crane the right size?

  • Smaller size400-ton crane — If the radius is shorter or the height lower than what calls for 500 tons, a 400-ton crane does the lift with a smaller convoy.

What the 500-ton crane rental includes

  • An operator or driver with the machine for the whole job
  • Delivery to your site in Jeddah or any city in the Kingdom
  • Inspection before dispatch and scheduled maintenance throughout the contract
  • A replacement unit if the machine fails during the contract
  • Daily, weekly, monthly and long-term contracts
  • Requests and support 24 hours a day

We serve Jeddah and every city in the Kingdom, with dedicated pages for the busiest: cranes in Jeddah cranes in Riyadh cranes in Makkah cranes in Dammam cranes in Jubail All service areas

500-ton crane rental questions

What drives the cost of hiring a 500-ton crane?
Mostly the size of the transport convoy and the distance to site, the days spent rigging and de-rigging, whether an assist crane is needed, road permits, and the time on site including standby. That is why each quote is prepared for the specific lift once the weight, radius, height and date are known.
Is a 500-ton crane the biggest mobile crane?
No. There are larger mobile cranes on eight or nine axles, and crawler cranes beyond 1,000 tons. But lifts that exceed a 500-ton chart are relatively rare and usually need a dedicated engineering study to choose the crane or lifting system.
How long a laydown strip does a 500-ton crane's jib need?
The lattice jib is laid out on the ground at full length before it is raised, and in this class that can be several tens of meters, so you need a clear, level strip at least that long, plus room alongside for the trucks and the assist crane. Send a site plan to settle the rigging direction.
How many days does a 500-ton crane stay on site for one lift?
Even a single lift usually takes several days: a day or more to rig, the lift day itself, then de-rigging, with possible standby if the wind picks up. The booking therefore covers the whole period, not just the lift day.
International Certifications

ISO Certifications

We are committed to international standards of quality, safety, and environmental management.

ISO 9001
ISO 9001
Quality Management
ISO 14001
ISO 14001
Environmental Management
ISO 45001
ISO 45001
Occupational Health & Safety
Internationally Certified
Global Standards
Certified Quality

Send Your Inquiry Now

We prioritize rapid response time.

Preferred contact method

Need a quick quote? Call us at +966 58 069 9998